Elbphilharmonie concert hall in Hamburg Germany

Commercial Project

Project Overview

Investor

AEON MALL Vietnam

Location

Hue

Year

2024

Innovative Solutions

Knauf supplied a tailored selection of products to meet the project’s specific demands for safety and environmental standards. In fire-prone areas, our Fire Resistant Boards - FireShield 15.9mm were installed to provide enhanced fire protection and comply with strict safety regulations. In moisture-exposed areas, such as restrooms and utility rooms, MoistShield 9mm were used to prevent water damage and mold growth, ensuring long-term performance.

For general wall and ceiling applications, StandardShield (12.7mm and 9mm) were selected to provide solid, reliable surfaces that balance durability with ease of installation. To ensure smooth, professional finishes throughout the building, Knauf EasyJoint90 was used to seamlessly integrate the boards, resulting in a polished and cohesive look.

Applied Products & Systems

Performance & Quality

This combination of Knauf products not only meets the high standards of AEON Mall Hue's design but also supports its commitment to energy conservation and green building practices under the LOTUS certification system.

Explore Knauf's Projects in Vietnam

Discover real-world projects successfully implemented. Let us be your partner and bring innovative and effective solutions to life.

Contact

Contact Knauf for Consultation and Technical Support.

Knauf Vietnam
7th floor, Harbour View Tower, 35 Nguyen Hue Street, Sai Gon Ward, Ho Chi Minh City, Vietnam