CH-Hallenbad-Indoor-Swimming-Pool-Uster-02

Hallenbad Indoor Swimming Pool

Uster, Switzerland

Create a Uniquely Playful, Golden Aesthetic

In creating a world-class Olympic pool and one of Switzerland’s most modern, state-of-the-art swimming facilities, the architect, contractor and client needed to work closely together throughout a construction period lasting over one and a half years.

Acoustics and corrosion resistance played key roles throughout – but everyone’s united ambition was to create a stunning aesthetic space to welcome the world’s swimmers and families.

When specifying ceilings, high humidity and a demanding environment are the first considerations needed for a swimming pool. But when the ambition is to create a stunning ceiling that enhances the whole building, the team set out to create a uniquely playful, golden aesthetic.

A special gold coating was applied to 1,500m² of the METAL R-H 200 ceiling in the Olympic pool, with 3,000m² of METAL R-H 200 in RAL 9010 covering the water park and surrounding areas. The pre-treated aluminium ceilings were primed and installed on a concealed suspension system to prevent corrosion – and reinforced by a moisture-resistant elastomer and fibreglass fleece backing to further improve resistance and acoustic performance.

CH-Hallenbad-Indoor-Swimming-Pool-Uster-04
CH-Hallenbad-Indoor-Swimming-Pool-Uster-03
CH-Hallenbad-Indoor-Swimming-Pool-Uster-02
CH-Hallenbad-Indoor-Swimming-Pool-Uster-01

Project Facts

  • Architect: K&L Architekten AG
  • Contractor: Isolag AG
  • Client: City of Uster, Healthcare Department
  • Photography Copyright: © Foto Lautenschlager

Project Information

  • Sector: Leisure & Hospitality
  • Room Type: Swimming Area / Corridor / Changing Room
  • Materials: Metal

Related Products