• Products & Systems
  • Divisions
  • Download Center
  • Tools & Services
Academy training centers Buhara 1

Initiation Training

Installation of Plasterboard for Partitions, Linings, and Non-Demountable Suspended Ceilings

Duration: 4 days - 24 hours

Training Objectives:

  • Understand the fundamentals of installing ceiling, partition, and lining systems.
  • Discover Knauf solutions and gain a comprehensive overview of our expertise in building finishing works.
  • Master the installation of Knauf systems through innovative techniques and solutions.
  • Acquire techniques compliant with best practices and learn to interpret technical documents.

Target Audience:

  • Beginner plasterers
  • Supervisory personnel
  • Design office technicians
  • Architects

Program

1. General Overview

  • History: Evolution and use of plasterboard in construction.
  • Plasterboard: Presentation of different types of boards and their application areas.
  • Works: Main types of structures made with plasterboard.

2. Metal Stud Partition Systems

  • System Components: Rails, studs, and fixings.
  • Installation: Layout and installation of the metal framework.
  • Board Fixing: Methods for fixing plasterboard.
  • Joints: Managing different joints between boards.

3. Lining Systems

  • Waterproofing: Performance criteria for ensuring the waterproofing of walls to be lined.
  • Installation: Bonding techniques (in accordance with DTU 25.42).
  • Specific Points: Elements to consider during installation.

4. Metal Stud Drywall Linings

  • Advantages and Characteristics: Benefits and specific features of the system.
  • Installation: Installation of metal stud drywall linings (according to DTU 25.41).

5. Joint and Connection Treatment

  • Standard Joints: Techniques for treating joints between boards, with or without tape.
  • Angle Treatment: Methods for managing angles.
  • Connections: Joints between plasterboard and elements of different natures.